Telecom planning consultancy

Planning the
networks that
connect tomorrow.

Zash Consult is an independent telecom planning consultancy.

2Years planning telecom infrastructure
150Sites planned across Belgium
100%Independent & vendor-neutral
Independent · Belgium Knesselare, BE
SITE 117 · MACRO 3.5 GHz · n78

Capabilities

Bands, standards & tooling we work with daily.

  • 700 MHz
  • 800 MHz
  • 900 MHz
  • 1800 MHz
  • 2100 MHz
  • 2600 MHz
  • 3.5 GHz · n78
  • 26 GHz · mmWave
  • ETSI
  • 3GPP
  • BIPT
  • ITU-R
  • Atoll
  • Planet
  • QGIS
  • AutoCAD

What we do

Planning, not construction.

We focus on the upstream work.

01 / Planning

Strategic network planning

Coverage and capacity studies.

  • Coverage
  • Capacity
  • Roadmaps
  • Tech choice
02 / Design

RF & site design

RF planning, line-of-sight, antenna design.

  • RF design
  • Line of sight
  • Antennas
  • Drawings
03 / Permitting

Site acquisition & permitting

Candidate search, negotiation, dossier.

  • Candidate search
  • Negotiation
  • Permits
  • Leasing
04 / Advisory

Technical advisory

Independent reviews of designs and portfolios.

  • Reviews
  • Due diligence
  • Procurement
  • RFP support

Coverage

Sites planned across Belgium & the wider region.

From dense urban macro grids to rural fixed-wireless backhaul — every dot is a study, a permit dossier or a build-ready design.

N 51° 10' 31''
E 03° 27' 31''

Field notes

Sites we've studied.

A glimpse at the kind of infrastructure we plan around.

Pole site study
Site #214 / GhentPole site
Coverage 150+ Sites studied across Belgium
Experience 12+ Years senior field experience

How we work

A clear path from brief to permit.

We compress rollout planning into four phases.

PHASE 01

Scope & survey

Discovery workshops and a costed plan.

PHASE 02

Design & engineer

RF planning, structural studies, drawings.

PHASE 03

Permit & acquire

Permitting dossiers and authority sign-off.

PHASE 04

Hand-off & assure

Construction-ready package and oversight.

A network is decided long before the first bolt is torqued. Get the planning right and the build is almost boring; get it wrong and no amount of crew hours will fix it.
Sven Daels Founding engineer · Zash Consult

Have a rollout to plan? Let's talk.

We come back within one business day.